Leaderkits
 

DLT Tape Drive Leader Replacement Procedure and available Leader-kits

 
Leader types

Smooth DLT260-DLT2000 Oval Hole
 
Grooved DLT2000XT-DLT4000 Round Hole
 
Wider Grooved DLT7000 Round Hole
 
Note:
TH3XX-XX = DLT2000XT
TH5XX-XX = DLT4000
TH4XX-XX = DLT2000
TH6XX-XX = DLT7000
 
Leaderkits available

DLT260 - DLT2000
DLT2000XT - DLT4000
DLT7000 - DLT8000
SDLT220 - SDLT320
DLT1 - VS80
LTO GEN-1

 
 
Basic leader-kits contains:

2 Leaders Gloves Instructions Cleaning Pads
10 Leaders Gloves Instructions Cleaning Pads
25 Leaders Gloves Instructions Cleaning Pads

Ofcourse we are not limited to a fixed number, all configurations are possible.

For more information
 

DLT Tape Drive Leader Replacement Procedure

WARNING

This procedure should be followed very carefully to prevent damage to the leader, head or drive.

To prevent several parts in the drive, including the leader, from oils of the skin, nylon gloves must be worn in all steps in this procedure.

Also observe ESD measures during the leader replacement.

 
1 Remove DLT Tape drive from the enclosure.
 
 
2 Locate the clear platic dustcover over the take-up reel. Locate the two rectangular slots near the front of the plastic cover. Insert a small flat blade screwdriver into each slot, gently pry each tab, and lift the front of the cover. A third holding tab is located at the rear of the drive, which can be pried open with just the finger, see figure.
   
3 With the cover removed, gently rotate the take-up reel until the leader ‘Mushroom" tip is exposed (rotate clockwise).
   
4 Unhook the take-up leader from the take-up reel with a small flat blade screw driver
 
   
5 Before the new leader is installed, it must be wiped entirely with a lint-free cloth pad dampened with isopropyl alcohol.. Attach the new and cleaned leader to the take-up reel with the bevel down, see figure.
   
  Take up reel, TOP
 
   
6 Very carefully slide the leader in front of the head positioning the leader so that it eneters the tape path and passes around all 6 rollers, see figure. Each roller has a flange that holds the leader in alignment and the mushroom end of the leader will protrude into the rear of the drive receiver.
 
   
7 Gently pull the leader to its full length. Position the leader so that the buckling link arm aligns to the rectangular slot in the leader and gently pull back the buckling arm with the index finger so that the hook engages the slot. Release the mechanism and verify that the mushroom tip is in front of the buckling mechanism, see picture.
 
   
8 You must now verify that the leader is completely in the tape path and that it is between the flanges of each roller. Rotate the take-up reel clock-wise about 1/8 th turn to seat the leader. Visually verify this.
   
9 Replace the dust cover.